AditNow... the site for mine explorers and mining historians Mine explorer and mining history videos on YouTube Connect with other mine explorers on Facebook
AditNow Mine Exploration
Tip: do not include 'mine' or 'quarry', search by name e.g. 'cwmorthin', use 'Sounds like search' if unsure of spelling

Advanced Search
'Sounds like search'
Quick a b c d e f g h i j k l m n o p q r s t u v w x y z
Tip: narrow down your search by typing more than one word and selecting 'Search for all words' or 'Exact search'



Tip: narrow down your search by typing more than one word and selecting 'Search for all words' or 'Exact search'



Home > Mines, Quarries & Sites > Boulby Potash Mine

Boulby Potash Mine (United Kingdom)


In the 1960s, with fertiliser demand growing and the UK reliant on imported potash, ICI decided to develop reserves 40km from its Cleveland facilities in North-east England. The 200ha mine site is at Boulby, half-way between the Tees Estuary and the port of Whitby. Design capacity is 1.0Mt/y of potassium chloride (KCl) product, sufficient to maintain a 55% UK market share and substantial export sales. The mine also by-produces salt, mostly for road de-icing. Construction started in 1969 and the first product was delivered in 1973. To ship the potash, a new ship/road/rail terminal was constructed at Teesdock.
ICI formed Cleveland Potash Ltd (CPL) in joint venture with the Anglo American group but subsequently sold its stake to Anglo American. In 2002 the "non-core" business was sold to ICL Fertilizers, a division of Israel Chemicals Ltd. CPL, which employs 828 people, and is now integrated with Iberpotash in Spain into ICL Fertilizers Europe, while Dead Sea Works recovers potash products in Israel.

GEOLOGY AND RESERVES

Boulby potash occurs at depths between 1,200 and 1,500m in a seam ranging from 0–20m but averaging 7m in thickness. Within a Permian evaporite sequence, sylvinite ore comprises 35–45% sylvite (potash) and 45–55% halite (salt), plus impurities. The sedimentary strata above the evaporites include the Triassic Sherwood sandstone, which contains brine under high pressure. This situation restricted exploration drilling from surface and, together with the depth involved, prevented underground exploration and trial mining. Consequently, planners were aware of the high stresses to be dealt with but not the full extent of faulting. And in 1976, CPL encountered shaly parts of the potash with sufficient pressurised gas to cause blow-outs during extraction.

MINING

Sinking the 5.5m-diameter, 1,150m-deep shafts through the sandstone was achieved by ground freezing and grouting of the rock shaft. Although the basic concept of roadway development in salt to access room-and-pillar potash panels was sound, determining the most efficient mining system proved difficult and it was not until 1984 that CPL reduced mining costs sufficiently to achieve profitability. By the mid-1990s, output had stabilised at 16,000t/d – 2.8Mt/y from six production sections.
To cope with greater stresses in the ore below 1,200m and to raise output above 3Mt/y by 2001, CPL converted its continuous miners to remote-controlled operation (so they can be safely used in shaly sections without prior blasting). The mine has a mine-wide digital micro-seismic monitoring system and has devised a two-road with stubs (rather than four-road) stress-relieving room-and-pillar technique which achieves more mining per shift. Jeffrey and Joy continuous miners discharge to Joy electric shuttle cars, which run to feeder breakers on the main conveyors to the hoisting shaft.

ORE PROCESSING

CPL's refinery separates KCl from the salt in the sylvinite ore and recovers three potash product grades. Following impact crushing and rod milling, de-sliming units feed underflow for salt and impurity removal by flotation while the overflow is classified and treated by filtration or slime flotation. The de-watered and screened flotation product is standard fertiliser-grade potash, some of which is converted to granular grade by a compaction circuit. The potash recovered by filtration and slime flotation is directed to crystallisers, which normally yield a soluble potash product. Assisted by EU funding, CPL developed a system for pumping tailings / seawater slurry into worked-out areas up to 1km from the core operation. This backfilling operation started in May 2003.
The fertiliser grades are sold for either direct application or complex fertiliser manufacture, and soluble potash for industrial applications.

PRODUCTION

Potash production rates are related to demand projections whilst salt output is roughly determined by the development required to achieve the potash target. Since 1994, potash output has varied between 800,000t and 1.03Mt/y, with salt production ranging from 384,000t to 662,000t. ICL now only discloses a group potash-production figure - 5.39Mt in 2004 - but indicated that CPL maintained production through the year, meeting 55% of the UK demand for potash.

(from the CPL website)

Photos of Boulby Potash Mine

Historic Photographs Of Boulby
Historic Photographs Of Boulby (0 photos)
Last updated April 13th by simonrail
Photographs Of Boulby
Photographs Of Boulby (34 photos)
Last updated December 18th 2017 by legendrider

Google Earth Map of Boulby Potash Mine

To view the location details and the Google Map please sign in or register an account.


Documents for Boulby Potash Mine

Click below to download documents, plans, surveys etc. for Boulby Potash Mine.

Major Mining Region

Boulby Potash Mine belongs to the Cleveland and East Yorkshire region.

Wisdom Miners Lamp Sale Starless River - Caving Store Moore Books: Specialist BooksI.A. Recordings: Mining and Industrial History DVDs
Disclaimer: Mine exploring can be quite dangerous, but then again it can be alright, it all depends on the weather. Please read the proper disclaimer.
© 2005 to 2019 AditNow.co.uk
Back to Top