Mine exploration, photographs and mining history for mine explorers, industrial archaeologists, researchers and historians aditnow.co.uk

AditNow YouTube mine exploration videos AditNow Facebook Group
Search for mines by country, zone and mineral type: Country:


OS Landranger sheet:
Mineral/product:

Only mines with content
Quick a b c d e f g h i j k l m n o p q r s t u v w x y z
Search mines by name: (Tip: do not include the words mine or quarry, just search on the name e.g. 'cwmorthin')
'Sounds like search' (useful if you are not quite sure how to spell the mine name)
Quick a b c d e f g h i j k l m n o p q r s t u v w x y z
Search photographs by keyword: (Tip: narrow down your search by entering more than one word and selecting all words or exact)
Search for any word
Search for all words
Exact search
Search the forum by keyword: (Tip: narrow down your search by entering more than one word and selecting all words or exact)
Search for any word
Search for all words
Exact search

Poldice Copper Mine (United Kingdom)

Poldice Mine was active in 17th century, which makes it one of the earliest record in Cornwall. Poldice Mine produced over 150,000 tons copper ore, 1,500 tons tin and 2,500 tons arsenic.

A dispute is recorded in 1678, over a water-course, had not been settled by 1681, when a petition before the Lord Warden of the Stannaries stated that the mine had produced £1,200 per year for Henry VIII.

In 1685 the mine was described by Hals as "that unparalleled and inexhaustible tin work which for about forty years space hath employed from eight hundred to a thousand men and boys labouring for tin....where they have produced for that time, yearly, at least £20,000 worth of that commodity. "

However by 1726 it is written off as "once profitable but now wrought so deep that there is no great benefit to be expected".

1742 William Lemon of Poldice successfully campaigned in Parliament to have the duty on sea borne coal dropped. The cessation of this duty in 1741 made it viable to purchase steam pumping engines and almost immediately 5 steam engines were purchased. Cornwall, of course, had no coal of its own, and needed to import coal by sea for all steam engines in its mines. William Lemon was the principal adventurer and provided the capital needed to solve the mine's water problem.

1748 The mine was in the vanguard of the construction of The County Adit. It was the brainchild of John Williams of Scorrier, then manager of Poldice, who needed to find a way to drain the maine. From its discharge near Point Mills in the Carnon Valley, The County Adit reached Poldice in the late 1760s, by which time the mine was over 100 fathoms deep in places. Deep adit construction played a vital role in removing water from Cornish mines and at its peak, the County Adit drained an estimated 13 million gallons/day from over 40 mines around Redruth and St Day through 38 miles of adits. John Williams is noted for driving the County Adit from Bissoe Bridge to drain the mines of Poldice, it took twenty years and the completed work takes in numerous branch adits and drains fifty mines. After profiting spectacularly from a sudden tin price rise, John Williams built Scorrier House, enlarging it substantially in 1845.

1778. Two Newcomen engines, of 66-inch and 60-inch cylinders, were bought to raise water to the adit. These engines consumed 192 bushels of coal per day, at a cost of £9. These were replaced almost immediately by two 63-inch Bolton and Watt engines, with a second pair in 1787.

1787 copper sales amounted to £11,315, compared with tin sales of £9,868. In 1748 the mine had produced tin only.

1787 saw riots at Poldice mine owing to copper price falls.

1792 the mine produced 575 tons of copper ore in two months, sales for 1792-98 inclusive amounting to £151,471.

1793 Bolton and Watt refused, on account of the money owed them by the mine, to deliver a 66-inch double (compound) engine on the mine. Odd in as much as the mine looked to be profitable at that time.

1800-04 Poldice was amalgamated with Wheal Unity. In these years 41,196 tons of copper ore were raised, and sold for £392,676, realising a profit (including £6,780 for tin sales) of £45,441. However, despite this output the mine was only 20 fathoms deeper in 1821 than it had been 60 years earlier.

1819 the first railway in Cornwall. The Gwennap mines were a long way from both the north and south coasts, and as a result incurred high costs to transport timber, coal and ore. John Williams of Scorrier constructed a horse-drawn plateway from his mines at Poldice through Scorrier to a newly-constructed harbour on the north coast at Portreath.

1852 Poldice was amalgamated with Carharrack Mine and Wheal Maid and worked as St Day United. In 1864 Wheals Unity, Gorland, Creegbrawse and Penkevil were added to the sett and the name was changed to Poldice United. The workings were 194 fathoms below adit (54 fathoms) by this time and 553 people were employed. Nine engines worked in the mines, from an 85-inch pumping engine to an 18-inch winder. During this period tin output increased, and became greater than that of copper in 1869.

By 1870 the sett was known as Poldice Mines, was 210 fathoms deep and employed 400 people.

1873 Poldice lost £1,862 during the first three months. In May it was decided to persevere for one more month, the decision being that of Sir F. M. Williams who held 1,700 of the 2,000 shares. Tin prices were falling and they decided to abandon the sett in June. Problems had been experienced with pumping and with chokes in the County Adit, a new 85" engine having been installed in January 1873.

1889 The mine as it was abandoned again. But the dumps were worked.

1890 over 5,100 tons of tin stone was sold, taken from the waste tips of Poldice and other Gwennap mines (Unity, Gorland and Goongumpus).

1905-6 a small amount of ore was produced working with Wheals Cusgarne and Buller. Closed 1913.

1926 the sett was acquired by Park-an-Chy Mine for its ore dressing plant. The mill was completed in early 1928 and equipped with 12 heads of Fraser and Chalmers stamps modified from the Nissen design. Other equipment included Hardinge Mills, Fraser and Chalmers shaking tables, Wetherill magnetic separators and hydraulic classifiers. Two Brunton calciners were used, parts of the old flues having been overhauled. Froth flotation also appears to have been carried out on the mine. The mill had a capacity of 120 tons per day. 100 tons of ore produced 4 tons of concentrate. The concentrate averaged 20% Sn, 35% As2O3, 5% WO3 and 0.5% Cu.

1928 Underground activity had recommenced by this time, in the hope of supplementing ore from Park-an-Chy, and the main shaft was cleared down to the 505 foot level by September 1928.

1930 operations at both mines ceased, probably because of a lack of ore reserves, although mining was stated to have been two years ahead of the mill when it started work.

1932 The mill was finally dismantled.

Today there are extensive area of dumps around prominent remains of calciner, chimney and buddles.

Courtesy of Cornwall-calling

Latest Documents for Poldice Copper Mine

Sorry, no documents have been uploaded yet for Poldice Copper Mine.

Photo Albums for Poldice Copper Mine

Poldice User Album: You are welcome to use this album for uploading photographs of Poldice. (Poldice-Copper-Mine-User-Album) Poldice User Album

You are welcome to use this album for uploading photographs of Poldice.

Last modified 02/08/2011 18:55:32 by LeeW.
Poldice Archive Album Poldice Archive Album

You are welcome to use this album for uploading archive or historical photographs of Poldice.

Last modified 25/11/2007 12:40:18 by carnkie.

Google Earth Map of Poldice Copper Mine

To view the Google Map for this mine please log in or register an account.



Discuss in the forum

Click here to discuss Poldice Copper Mine in the forum.

The correct forum will be automatically selected.
Poldice Copper Mine Events & Meets

There are no events currently planned.

Add an Event

If you would like to visit Poldice Copper Mine then click here to add an event to the calendar.
Poldice Workforce

If you worked or work at Poldice why not share that information with other AditNow members?

Add Yourself
Guides

You must be logged in to access guides.

Please log in or register an account.
Bookmark with Del.icio.us Digg This! Post to Reddit Share on Facebook Post to StumbleUpon Post to Kaboodle Bookmark with Yahoo Bookmark with Google
Quick Upload Links

If you would like to share your photographs and documents please use the links below:

Upload a Document
Post a Sticky (Note)
Discuss in Forum
My Favourites

You must be logged in to access your Favourite Mines/Quarries.

Please log in or register an account.
Where on earth is this mine?

To view the grid reference for this mine please log in or register an account.
Mines nearby (2 km)

Ale & Cakes Copper Mine
Andrew Tin Mine
Bissoe Pool Mixed Mine
Carharrack Mixed Mine
Consolidateds Mixed Mine
Creegbrawse Mixed Mine
Cupboard Mixed Mine
Cupboard Hill Mixed Mine
East Ale & Cakes Copper Mine
East Change Mixed Mine
East Wheal Damsel Copper Mine
East Wheal Fortune Mixed Mine
East Wheal Virgin Mixed Mine
Girl Mixed Mine
Gwennap United ( 1901 ) Mixed Mine
Hallenbeagle Mixed Mine
Killifreth Mixed Mine
Lovelace Mixed Mine
Maid East Mixed Mine
Muttrall Copper Mine
North Wheal Damsel Copper Mine
Park-An-Chy Mixed Mine
Penkevil Tin Mine
Poldice (Parc-an-Chy) Arsenic Works Arsenic Factory
Poldice Stream Works Tin Stamp or Dressing Floor
Poldory Mixed Mine
Quick Mixed Mine
Ree Mixed Mine
Roselabby Mixed Mine
South Wheal Gorland Mixed Mine
Spinster Mixed Mine
Ting Tang Mixed Mine
Ting Tang Consols Mixed Mine
Todd Mixed Mine
Tolgullow United Mixed Mine
Tregothnan United Mixed Mine
United Mines Copper Mine
Uniteds Mixed Mine
Unity Explosive Factory
West Poldice Mixed Mine
West Wheal Clifford United Mixed Mine
West Wheal Damsel Copper Mine
West Wheal Gorland Mixed Mine
West Wheal Jewell Mixed Mine
Wheal Busy (Chacewater) Copper Mine
Wheal Clifford Mixed Mine
Wheal Clinton (Gwennap) Copper Mine
Wheal Cusvey Mixed Mine
Wheal Fortune (Gwennap) Copper Mine
Wheal Gorland Copper Mine
Wheal Henry (Gwennap) Tin Mine
Wheal Jewel Mixed Mine
Wheal Maid (Gwennap) Copper Mine
Wheal Pink Copper Mine
Wheal Prosper Mixed Mine
Wheal Squire Mixed Mine
Wheal Unity Wood Mixed Mine
Wheal Virgin Mixed Mine
Whiteworks Tin Mine

Change view area
Contact?

If you have any questions at all about mine exploration or the AditNow web site please get in touch:

info@aditnow.co.uk
Problems?

Spotted any problems with the web site, or any inaccuracies or errors in the information on here? Please let us know:

info@aditnow.co.uk
Moore Books: Specialist BooksI.A. Recordings: Mining and Industrial History DVDsExplore a Disused Welsh Slate Mine
Disclaimer: Mine exploring can be quite dangerous, but then again it can be alright, it all depends on the weather. Please read the proper disclaimer.
© 2005 to 2010 AditNow.co.uk
Top of Page